Reminder: you can enlarge a photo by clicking on it. Return to the blog with another click.
To the right, we can just see in the left hand corner the cement mixer truck along with the hose and the whole of the foundation, covered, perhaps, to avoid a too rapid drying.
Before a few finishing touches could be accomplished in the hall way, the terrazzo had to be polished to reveal the "real thing". This is done, as you can see, with a lot of water as the polisher does his work. Another man is suctioning the slurry, as the spent liquid called. One of the things that impresses blogger is how tightly ordered each step of this whole complex renovation is. Good management.
On a higher level, 2 1/2 actually, the new classroom is now occupying most of the media center's south side. This classroom The lavatory on the first floor is almost finished so we can fill you in on that next time. Be sure to stop by.
No comments:
Post a Comment