Monday, August 13, 2018

CNSTRCTN Vol. XV, #1 Get out the Castanets!

Memories, like birds--fleeting.  One must grasp and hold in heart's hands.

The stars are aligned rightly at last with iPad problems solved!  Photos were waiting to be released from captivity and here they are.  The first shots will be about the Spanish steps in the auditorium.  The first photo shows the delivery of the basic material (looks light? It is).  Second shot shows how the builders will know which styrofoam blocks (yes) go where.  The next row: how they looked  without the steps blocks, and the last shot shows where the project stands currently.  Here goes.


   
                                                       


Concrete was poured over  the styrofoam, i.e. all the surfaces that are horizontal, while another hard material went on the vertical surfaces.  Carpeting will cover both horizontal and vertical surfaces.  It will be quite impressive when it is finished.

Other things, of course, are developing.  This is an early photo of what has been happening around
the ceiling architectural embellishment in the cafeteria.


Moving over to the collaborative learning center (recall--new library and tech center), we can see now the library desk that's been installed
.
Pretty nifty looking with a light color that will enhance that end of the room.
Other things have been happening in other places, of course.  Ceiling tiles are being replaced or going in fresh.  The HVAC stuff is getting closer to being completely installed.  And so the place hums along every day now even on Saturdays.

Keep us in your prayers, and stayed tuned for further adventures of 1699 Hilton Drive.  God bless.

No comments: